Experience AquaSafe.Ai in Action

See how our AI eliminates trial-and-error from water treatment with this interactive demonstration

Scroll to begin
1

Input Your Water Quality

Start by entering your current water quality parameters.

Zero historical data needed. Plug in your current raw water quality and get instant predictions.

Water Quality Input

0 0.0 50
20 20 200
1 1.0 10
1 1.0 6
5 5.0 30
2

Personalized Priority Matrix

Optimize Turbidity Removal

Achieve lowest possible filtered water turbidity for regulatory compliance and clear water quality.

Optimize Organics Removal

Maximize removal of organic matter (DOC) to reduce the formation of Disinfection Byproducts (DBPs) and protect downstream adsorbents (GAC/IX) used for PFAS removal.

Reduce Chemical Costs

Minimize the combined usage of coagulant and pH adjusting chemicals to lower operating expenses.

Operational Safety

Prioritize a stable coagulant dose to reduce rapid adjustments and maintain process reliability and safety.

Sludge Reduction

Minimize the volume and mass of sludge to lower hauling and disposal expenses.

Set Your Priorities

Define what matters most for your treatment plant. Our AI adapts recommendations based on your specific goals.

Each priority is weighted from 1 (lowest) to 5 (highest) to create personalized treatment strategies.

3

What Happens in the Backend...

Unlike traditional, history-bound models, our algorithm is free to explore the full chemical landscape. Our AI is built on a universal coagulation dataset, enabling it to explore every possible dose and pH combination to find a true global optimal condition.

Processing Speed
0.3s
Model Accuracy
98%
Scenarios Analyzed
13,580
Confidence
89%
Optimization Algorithm in Action
Evaluating treatment scenarios: 0 / 13,580
Fails Criteria
Passes Criteria
4

Actionable Insights

Interactive visualizations showing where your plant currently operates and the optimal path forward

Optimized Condition
2.8x

Suggested optimal coagulant dose is 277% lower than baseline.

Performance Improvement
3.3x

Projected cost reduction achieved while maintaining target water quality.

Next Steps

Use our JarWizard apparatus to validate model predictions in under 30 minutes before implementing changes plant-wide.